Ten-year transportation plan and tolls

AI

Adopts the state's 2027-2036 ten-year transportation plan, authorizes toll rate adjustments at specified turnpike plazas, and transfers certain conservation land to New Boston for reconstruction of the Gregg Mill Road Bridge.

(New Title) relative to the state 10-year transportation improvement plan; relative to toll rate adjustments and periodic toll reviews for the New Hampshire turnpike system to support the 2027-2036 ten-year transportation plan; and relative to reconstruction of the Gregg Mill Road Bridge in the town of New Boston.

Transportation and HighwaysMunicipalitiesEnvironment - Conservation

Status

Vetoed by the governor — the override vote has not been held yet · July 16, 2026
  1. Introduced
  2. House
  3. Senate
  4. Governor
  5. Law

Division of testimony

7 submissions
Support 5Oppose 2Neutral 0
Megan SchmittOpposeCONCORD, NHfor MyselfJan 20, 2026

You cannot definite an "adequate" education & Cherish does not equal a mandate.

June TriscianiSupportManchester, NHfor MyselfJan 20, 2026

As a Manchester resident, I strongly support including projects 16099A, 16099B, 41594, and 43850 in the New Hampshire Department of Transportation’s highway program through HB 2026. Manchester is New Hampshire’s largest city and a critical regional transportation hub. The I-293 corridor is essential to daily commuting, freight movement, emergency response, and access to jobs and services throughout the state. Yet this corridor continues to experience persistent congestion, safety concerns, and aging infrastructure that no longer meets current demand. Projects 16099A and 16099B would reconstruct I-293 Exits 6 and 7—interchanges that routinely experience congestion, unsafe merging, and delays affecting Manchester residents and regional travelers alike. Modernizing these interchanges would improve traffic flow, reduce crash risk, and strengthen connections to I-93, downtown Manchester, and major employment centers. Project 41594 provides targeted operational improvements at I-293 Exit 1, one of the city’s busiest gateways. These cost-effective changes would improve circulation and safety while delivering meaningful, near-term benefits. Project 43850 addresses documented safety concerns at the Eddy Road and Exit 6 southbound on-ramp intersection, where existing conditions create conflict points and elevate crash risk. Focused safety improvements here would reduce crashes and improve access to the highway system. Together, these projects represent a coordinated, practical investment in safety, mobility, and economic vitality. Including them in the Ten-Year Plan aligns with statewide transportation goals, strengthens eligibility for federal funding, and ensures that one of New Hampshire’s most heavily traveled urban corridors functions safely and reliably into the future. I respectfully urge you to advance HB 2026 with these projects included.

Dana DexterSupportManchester, NHfor MyselfJan 20, 2026

I am a resident of Manchester, New Hampshire, and I am offering this testimony in my personal capacity. While I serve as a Manchester alderman and am employed as a police officer in New Hampshire, my comments today reflect my own observations and experiences as a Manchester resident and commuter and do not represent the official positions of the Manchester Board of Mayor and Aldermen, the City of Manchester, or my employing police department. Manchester is New Hampshire’s largest city and a key regional transportation hub, and the I-293 corridor plays a critical role in daily commuting, freight movement, emergency response, and access to employment and services throughout the state. Ongoing congestion, outdated interchange design, and limited operational capacity along I-293 create challenges for drivers and contribute to safety concerns throughout the corridor. Including projects 16099A, 16099B, 41594, and 43850 in the New Hampshire Department of Transportation’s highway program is necessary to address long-standing safety issues and improve traffic operations in this heavily traveled area. Projects 16099A and 16099B, which focus on reconstructing I-293 Exits 6 and 7, would modernize interchanges that no longer function effectively for today’s traffic volumes. These areas experience frequent congestion, difficult and sometimes unsafe merging, and recurring crashes. In my role as a police officer, I have responded to crashes and traffic incidents in other areas with similar congestion and interchange design issues, and I have personally experienced the delays and safety challenges these conditions create while traveling through the I-293 corridor. Reconstructing these interchanges would improve traffic flow, reduce bottlenecks, and create safer, more predictable conditions for motorists and first responders alike. In addition, the City of Manchester is currently reconstructing the adjacent bridges over the Merrimack River and Amoskeag Falls. Completion of these local bridge projects will complement the State’s planned improvements at Exits 6 and 7, helping to improve overall traffic flow, reduce congestion, and maximize the positive safety and mobility impacts in this area. Project 41594, which proposes operational improvements at I-293 Exit 1, represents a practical and cost-effective opportunity to improve circulation and safety at one of Manchester’s busiest gateways. Targeted operational changes at this location can reduce congestion, improve traffic movements, and support safer day-to-day travel. Project 43850 addresses safety concerns at the Eddy Road and Exit 6 southbound on-ramp intersection, where existing conditions create conflict points and elevated crash risk. Focused safety improvements at this location would reduce collisions, improve access to the highway system, and enhance overall roadway safety. Taken together, these projects represent a coordinated and practical investment in safety, mobility, and congestion reduction. Their inclusion in the DOT highway program helps ensure that one of New Hampshire’s most challenging urban corridors functions more safely and reliably for residents, commuters, and emergency responders well into the future.

Joyce CappielloSupportBarrington, NHfor MyselfJan 20, 2026

I support the inclusion of two crucial safety projects in Barrington: 1. Barrington (43547) NH Route 9 Pedestrian safety improvements including sidewalks and NH Route 125 crossing.(engineering 2029 construction 2031) 2. Barrington (43965) Safety improvements at the intersection of NH 125 and Beauty Hill Road. (construction 2029). I shudder when I see children walking/biking across rte 125 near the center of our town as I am concerned about their safety. The proposed safety improvements will go a long way in keeping our children and residents safer. Joyce Cappiello, Select Board

Jay RuaisSupportManchester, NHfor ManchesterJan 20, 2026

Position recorded without written comment.

Daniel RichardsonOpposeNashua, NHfor MyselfJan 20, 2026

Position recorded without written comment.

Rad NicholsSupportDurham, NHfor New Hampshire Transit Association & the Cooperative Alliance for Seacoast Transportation (COAST)Jan 20, 2026

Position recorded without written comment.